The Construction Engineering Research Laboratory in Champaign, Illinois, has successfully three-dimensionally printed a 512 square-foot concrete structure. The structure, called a barracks hut or B-Hut, was printed as a result of a three year Army Program called the “Automated Construction of Expeditionary Structures.” It uses an additive manufacturing process to “print” semi-permanent structures in a…