Research & Development World

  • R&D World Home
  • Topics
    • Aerospace
    • Automotive
    • Biotech
    • Careers
    • Chemistry
    • Environment
    • Energy
    • Life Science
    • Material Science
    • R&D Management
    • Physics
  • Technology
    • 3D Printing
    • A.I./Robotics
    • Software
    • Battery Technology
    • Controlled Environments
      • Cleanrooms
      • Graphene
      • Lasers
      • Regulations/Standards
      • Sensors
    • Imaging
    • Nanotechnology
    • Scientific Computing
      • Big Data
      • HPC/Supercomputing
      • Informatics
      • Security
    • Semiconductors
  • R&D Market Pulse
  • R&D 100
    • 2025 R&D 100 Award Winners
    • 2025 Professional Award Winners
    • 2025 Special Recognition Winners
    • R&D 100 Awards Event
    • R&D 100 Submissions
    • Winner Archive
  • Resources
    • Research Reports
    • Digital Issues
    • Educational Assets
    • R&D Index
    • Subscribe
    • Video
    • Webinars
    • Content submission guidelines for R&D World
  • Global Funding Forecast
  • Top Labs
  • Advertise
  • SUBSCRIBE

Parts of ATV Edoardo Amaldi coming together

By R&D Editors | January 19, 2011

Parts of ATV Edoardo Amaldi coming together

The three main parts of ATV-3 arrived at the premises of EADS Astrium in Bremen, Germany, in December. The vehicle is now waiting to be assembled at the end of January.

The Integrated Cargo Carrier, built by Thales Alenia Space Italy, was transported by a voluminous Beluga aircraft from Turin airport just before Christmas.

This module represents about 60% of the total ATV volume and will hold all the liquid and dry cargo, totalling up to 7.5 tonnes.

Europe-wide engineering expertise

 

The Equipped Propulsion Bay, containing the rocket engines and propellant tanks, was built on site in Bremen. The Equipped Avionics Bay – ATV’s ‘brain’ – was delivered from Toulouse, France, after thermal vacuum testing.

As the computers in the avionics bay generate a lot of heat, the thermal control system of this section is particularly sophisticated – and vital for ATV’s success.

 

These two modules will be combined at the end of the month into their final configuration for launch. Later in the spring, the cargo carrier will be electrically connected with them for final testing.

ATV-3 will be shipped to the launch site, Europe’s Spaceport in Kourou, French Guiana, in September for dispatch to the ISS in February 2012.

Mass-producing the cargo craft

 

The newest ATV, named after a leading figure in Italian space science last century, will be the first to be processed and launched within the target cadence of one ATV per year.

 

Construction of the following ATVs is also on schedule to keep up the tempo.

“The main challenges of Edoardo Amaldi will be not only to perform its very complex mission as successfully as its predecessors, but also to prepare it within a much shorter interval since the previous one,” says Massimo Cislaghi, ESA’s ATV-3 Mission Manager.

“This implies, for instance, that any technical information from the Johannes Kepler mission will become available only when the Edoardo Amaldi preparations are already at a very advanced stage.”

So far, the only differences between the two spacecraft are the name and the cargo manifest.

 

The launch by the end of February 2012 will be, “vital for space station logistics, especially at a time when the operational life of the US Space Shuttle will have come to an end, and its replacement might not yet be ready,” comments Massimo.

After being happily mated in Bremen for system integration and testing, the parts will then be separated. Their next destination is French Guiana, where all the pieces will be reassembled and tested again before the vessel’s voyage into space.

SOURCE

Related Articles Read More >

Satellite data sheds light on wetland health in cloud-covered regions
Alice & Bob outlines roadmap to 100 logical qubits by 2030
Idemitsu expands partnership with Enthought to accelerate battery material innovation
top 25 AI patent winners of 2024
From NVIDIA to SAP: How 25 global AI patent leaders fared in 2024
rd newsletter
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, trends, and strategies in Research & Development.
RD 25 Power Index

R&D World Digital Issues

Fall 2025 issue

Browse the most current issue of R&D World and back issues in an easy to use high quality format. Clip, share and download with the leading R&D magazine today.

R&D 100 Awards
Research & Development World
  • Subscribe to R&D World Magazine
  • Sign up for R&D World’s newsletter
  • Contact Us
  • About Us
  • Drug Discovery & Development
  • Pharmaceutical Processing
  • Global Funding Forecast

Copyright © 2026 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search R&D World

  • R&D World Home
  • Topics
    • Aerospace
    • Automotive
    • Biotech
    • Careers
    • Chemistry
    • Environment
    • Energy
    • Life Science
    • Material Science
    • R&D Management
    • Physics
  • Technology
    • 3D Printing
    • A.I./Robotics
    • Software
    • Battery Technology
    • Controlled Environments
      • Cleanrooms
      • Graphene
      • Lasers
      • Regulations/Standards
      • Sensors
    • Imaging
    • Nanotechnology
    • Scientific Computing
      • Big Data
      • HPC/Supercomputing
      • Informatics
      • Security
    • Semiconductors
  • R&D Market Pulse
  • R&D 100
    • 2025 R&D 100 Award Winners
    • 2025 Professional Award Winners
    • 2025 Special Recognition Winners
    • R&D 100 Awards Event
    • R&D 100 Submissions
    • Winner Archive
  • Resources
    • Research Reports
    • Digital Issues
    • Educational Assets
    • R&D Index
    • Subscribe
    • Video
    • Webinars
    • Content submission guidelines for R&D World
  • Global Funding Forecast
  • Top Labs
  • Advertise
  • SUBSCRIBE