Research & Development World

  • R&D World Home
  • Topics
    • Aerospace
    • Automotive
    • Biotech
    • Careers
    • Chemistry
    • Environment
    • Energy
    • Life Science
    • Material Science
    • R&D Management
    • Physics
  • Technology
    • 3D Printing
    • A.I./Robotics
    • Software
    • Battery Technology
    • Controlled Environments
      • Cleanrooms
      • Graphene
      • Lasers
      • Regulations/Standards
      • Sensors
    • Imaging
    • Nanotechnology
    • Scientific Computing
      • Big Data
      • HPC/Supercomputing
      • Informatics
      • Security
    • Semiconductors
  • R&D Market Pulse
  • R&D 100
    • Call for Nominations: The 2025 R&D 100 Awards
    • R&D 100 Awards Event
    • R&D 100 Submissions
    • Winner Archive
    • Explore the 2024 R&D 100 award winners and finalists
  • Resources
    • Research Reports
    • Digital Issues
    • R&D Index
    • Subscribe
    • Video
    • Webinars
  • Global Funding Forecast
  • Top Labs
  • Advertise
  • SUBSCRIBE

Space Shuttle Endeavour to Launch No Earlier Than May 16

By R&D Editors | May 7, 2011

Space Shuttle Endeavour to Launch No Earlier Than May 16

News Conference Scheduled for May 9 CAPE CANAVERAL — NASA managers have retargeted space shuttle Endeavourâ??s launch to no earlier than Monday, May 16. After a meeting on Friday, they also extended the length of Endeavour’s STS-134 mission to the International Space Station from 14 to 16 days. If Endeavour launches on May 16, liftoff would be at 8:56 a.m. EDT. At 3 p.m. on Monday, May 9, NASA Space Shuttle Program Launch Integration Manager Mike Moses and Shuttle Launch Director Mike Leinbach will hold a news conference at Kennedy Space Center in Florida to discuss the progress of repairs since Endeavour’s launch postponement on April 29. The news conference will air live on NASA Television and the agency’s website. Reporters may ask questions from participating NASA centers or by calling into a phone bridge. Kennedy technicians are continuing work to resolve an issue in a heater circuit associated with Endeavourâ??s hydraulic system that resulted in the launch postponement. Technicians determined the failure was inside an aft load control assembly, which is a switchbox in the shuttle’s aft compartment, and possibly its associated electrical wiring. Although the root cause of the failure in the switchbox has not been found, technicians are replacing hardware that could have caused the problem. The faulty box was changed Wednesday, and a test of nine shuttle systems powered by the new box is under way. This weekend, technicians will install and check out new wiring that bypasses the suspect electrical wiring connecting the switchbox to the heaters. They also will run the heaters for up to 30 minutes to verify they are working properly and complete retesting of the other systems powered by the switchbox. The shuttle has three Auxiliary Power Units (APUs) that provide hydraulic power to steer the vehicle during ascent and entry. The hydrazine fuel lines on each APU have two heater circuits that prevent the fuel from freezing while the shuttle is in space. NASA launch commit criteria and flight rules require all APUs and heater circuits to be operational for launch. On Endeavourâ??s first launch attempt, one of two heaters for APU-1â??s fuel line did not work. Engineers confirmed the circuit in the original switchbox that directed power to the heaters was shorted out. Launch attempts are available through May 26. May 21 is the only day a launch is not an option because it would lead to a May 23 docking with the space station. May 23 is when three of the space stationâ??s Expedition 27 crew members undock and return home in their Soyuz spacecraft. Managers reviewed the STS-134 mission timeline and determined the Endeavour crew can accomplish all objectives even with the departure of the three station crew members. To use the phone bridge for the May 9 news conference, reporters must have valid media credentials issued by a NASA center or for the STS-134 mission. Journalists planning to use the phone bridge must contact the NASA Johnson Space Centerâ??s newsroom at 281-483-5111 no later than 2:45 p.m. Newsroom personnel will verify credentials and transfer reporters to the phone bridge. Capacity is limited and available on a first-come, first-served basis. For NASA TV downlink information, schedules and links to streaming video, visit:

http://www.nasa.gov/ntv
Endeavour’s six astronauts will return to Kennedy on May 12. For the latest information about the shuttle mission and its crew, visit:
http://www.nasa.gov/shuttle

SOURCE

Related Articles Read More >

Satellite data sheds light on wetland health in cloud-covered regions
Alice & Bob outlines roadmap to 100 logical qubits by 2030
Idemitsu expands partnership with Enthought to accelerate battery material innovation
top 25 AI patent winners of 2024
From NVIDIA to SAP: How 25 global AI patent leaders fared in 2024
rd newsletter
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, trends, and strategies in Research & Development.
RD 25 Power Index

R&D World Digital Issues

Fall 2024 issue

Browse the most current issue of R&D World and back issues in an easy to use high quality format. Clip, share and download with the leading R&D magazine today.

Research & Development World
  • Subscribe to R&D World Magazine
  • Enews Sign Up
  • Contact Us
  • About Us
  • Drug Discovery & Development
  • Pharmaceutical Processing
  • Global Funding Forecast

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search R&D World

  • R&D World Home
  • Topics
    • Aerospace
    • Automotive
    • Biotech
    • Careers
    • Chemistry
    • Environment
    • Energy
    • Life Science
    • Material Science
    • R&D Management
    • Physics
  • Technology
    • 3D Printing
    • A.I./Robotics
    • Software
    • Battery Technology
    • Controlled Environments
      • Cleanrooms
      • Graphene
      • Lasers
      • Regulations/Standards
      • Sensors
    • Imaging
    • Nanotechnology
    • Scientific Computing
      • Big Data
      • HPC/Supercomputing
      • Informatics
      • Security
    • Semiconductors
  • R&D Market Pulse
  • R&D 100
    • Call for Nominations: The 2025 R&D 100 Awards
    • R&D 100 Awards Event
    • R&D 100 Submissions
    • Winner Archive
    • Explore the 2024 R&D 100 award winners and finalists
  • Resources
    • Research Reports
    • Digital Issues
    • R&D Index
    • Subscribe
    • Video
    • Webinars
  • Global Funding Forecast
  • Top Labs
  • Advertise
  • SUBSCRIBE